A practical guide to finding the delay

The job is done. What is finance still waiting for?

Follow one job from completion to invoice. Find what is missing, who is chasing it and what needs to change before buying another tool.

Follow the job

What is finance waiting for?

This fictional example shows where a job can get stuck. For each step, check the information, the person responsible and what needs to happen next.

Illustrative job · J-1042

J-1042 / Service visitWork marked complete
Waiting for detail

Finished work may still be missing billing details.

Needed
Approved extras, actual time and the client’s purchase order.
Next owner
The coordinator gathers the missing details for Finance.
What to check
How often are details missing, and how long does the invoice wait?

Record time spent chasing information separately from time spent waiting. They are different problems.

1. Decide where the check starts and ends.

Start when the team marks the job complete. Finish when an accurate invoice is issued. Ask the people involved to walk through recent examples together.

Include ordinary jobs and ones that needed correction. A few examples can show where to look. They do not establish an average for the whole business.

2. Capture what actually happened.

Use existing records where possible. Make clear what you observed, what someone told you and what you estimated. For each job, record:

RecordWhat to capture
Start and finishJob completed, ready for invoicing, and accurate invoice issued: the date and time of each event.
Time spent doing the workMinutes spent by each person gathering, entering, checking and correcting information.
WaitingWhen the job stopped moving, what was missing, and who or what could unblock it.
CorrectionsWhat was returned or changed, why, and how much extra work it created.
Records and systemsWhere the team found each piece of information and where they copied it next.
Who was responsibleWho owned the next action and whether that was clear to everyone involved.

3. Separate work time from waiting time.

Measure time spent doing the work, time waiting and time correcting errors separately. When estimating time saved, include the cases that still need manual work, whether people use the new process and the effort to keep it running.

Decide whether a fix is worth it

Use the actual work to check the estimate.

How many jobs are involved? How much effort do they take? What still needs a person? Write down the assumptions so the team can challenge them.

Illustrative example

Manual record entry · one month

80 hours

Time spent entering records today

800 records × 6 minutes ÷ 60
52 hours

Estimated time after the change

Includes manual cases, review and upkeep
28 hours

Time available for other work

Time available for other useful work

This is a fictional planning example, not a client result or savings promise. Time becomes a cash saving only when an expense falls. Include build and software costs before deciding.

See the assumptions and calculation

Assume 75% of the 800 records can use the new process, and people use it for 80% of those: 480 records. Each takes 2 minutes of human work, including review and corrections. The other 320 still take 6 minutes. Add 4 hours a month for upkeep.

After: (480 × 2 + 320 × 6) ÷ 60 + 4 = 52 hours. Difference: 80 − 52 = 28 hours.

Use real volumes and observed work before applying this estimate to your business. Include difficult cases and check that the resulting work is still correct.

4. Compare the fixes that could help.

Find the cause first. The team may need a clear owner, a shared record or a connection between tools. Missing or inconsistent details may need cleanup before automation helps.

Compare the build, software and upkeep costs, plus the time your team will need to spend. If the likely benefit is small, a smaller fix may be enough.

5. Write down what you recommend and why.

The problem
Where the work stalls, who it affects and why it matters now.
The evidence
The jobs checked, the work and waiting time, and what still needs verification.
The proposed change
The smallest useful fix, other options, costs and what it depends on.
The check
The same measures before and after, including invoice accuracy and difficult cases.
The owner
Who approves the work, who runs the process and who maintains the setup.

Let operations and finance correct the picture before committing. Both teams should agree what is happening and how they would recognize an improvement.

An example of a build and handover

A repair-system project shows how I worked with a wider team and trained the client’s developer.

One thing to check

Separate time spent preparing the invoice from time spent waiting for an approved rate. Those are different problems and need different fixes.

Where is the job getting stuck?

Bring one completed job that waited for an invoice. We’ll discuss what was missing and where to look.

Free, 30 minutes. Bring one example. No technical brief needed.

Follow one customer change

A customer change has to reach the people doing the work.

This fictional example follows a customer request through the agreement, delivery plan and billing details.

Illustrative scenario. This shows a possible process, not a client result or a live system.

1. Agreement

Agreement · Current handoff

One visit, one location, Friday.

What the team needs
The approved quote for one service visit at one location on Friday.
Responsible person
Sales owner
Checks
Confirm scope, date and price against the approved agreement.
Next action
Keep the approved agreement visible while the team reviews the request.
Check the fictional sample records →

Agreement · Possible improvement

One visit, one location, Friday.

What the team needs
The original approved agreement, with a link to the pending change request.
Responsible person
Sales owner
Checks
Keep the proposed change separate from what has already been approved.
Next action
Give each affected team the same approved version.
Check the fictional sample records →

2. Change

Change · Current handoff

Second location and Tuesday requested. Approval is pending.

What the team needs
A customer email asks for a second location and Tuesday instead of Friday. The scope and price decision is still pending.
Responsible person
Person responsible for approval
Checks
Check what changed and who still needs to approve it.
Next action
Find the request and the person who must approve it before changing the agreement.
Check the fictional sample records →

Change · Possible improvement

Second location and Tuesday requested. Approval is pending.

What the team needs
Record the extra location, requested date and unresolved price in a request linked to the job.
Responsible person
Named approver, with sales coordinating
Checks
Mark the request as awaiting approval and show who needs to decide.
Next action
Ask for the decision. Recording a request does not approve it.
Check the fictional sample records →

3. Delivery

Delivery · Current handoff

The draft schedule has moved. The extra location is unresolved.

What the team needs
A draft schedule says Tuesday, while the second location is not confirmed.
Responsible person
Delivery planner
Checks
Compare the draft schedule with the approved agreement and pending request.
Next action
Resolve the disagreement before assigning people or equipment to the changed work.
Check the fictional sample records →

Delivery · Possible improvement

The draft schedule has moved. The extra location is unresolved.

What the team needs
The pending decision is visible beside the latest approved scope.
Responsible person
Delivery planner
Checks
Check approval, people, equipment and any exceptions before updating the schedule.
Next action
Once the decision is recorded, update delivery from the approved change.
Check the fictional sample records →

4. Billing

Billing · Current handoff

Finance still has the original quote.

What the team needs
Finance has the original quote and needs approved extras and delivery evidence.
Responsible person
Finance owner
Checks
Check the approved price, the work done and whether an update failed or was sent twice.
Next action
Flag unresolved items for review before preparing the invoice.
Check the fictional sample records →

Billing · Possible improvement

Finance still has the original quote.

What the team needs
Prepare the invoice from approved changes and checked delivery details. Show any missing information.
Responsible person
Finance owner
Checks
Compare approved work with completed work. Check for repeated or failed updates.
Next action
Prepare the invoice when the required details are complete. Otherwise, send the missing item back to the person responsible.
Check the fictional sample records →
Read the fictional sample records
  • Approved quote: one service visit, one location, Friday.
  • Customer email: please add a second location and move the visit to Tuesday.
  • Draft delivery plan: Tuesday entered; extra location unresolved.
  • Finance record: original quote; approval of changed scope and price still pending.

These are invented records used only for this illustration.

AI could help extract the requested changes. A person approves the commitment, and the resulting records still need checking.